Contractormag 783 0810siouxchief 0

POSITIONING BRACKET

Aug. 10, 2010
THIS POSITIONING BRACKET has been redesigned. Changes include placing all ½" copper stub-out holes at the same height, providing a 3.42" centerline in relation to the waste pipe. Other changes include a snap-lock band and the addition of an 8" piece of ...

THIS POSITIONING BRACKET has been redesigned. Changes include placing all ½" copper stub-out holes at the same height, providing a 3.42" centerline in relation to the waste pipe. Other changes include a snap-lock band and the addition of an 8" piece of self-adhesive felt to each bag.

Sioux Chief
CIRCLE 112 ON INQUIRY CARD

Voice your opinion!

To join the conversation, and become an exclusive member of Contractor, create an account today!