EMCOR Subsidiaries Win Transit, Chrysler Jobs


         Subscribe in NewsGator Online   Subscribe in Bloglines

Norwalk, Conn. — EMCOR Group Inc. announced that its subsidiary Design Air Ltd. has been awarded a contract to upgrade the mechanical and electrical systems for Seattle Metro Transit's Central Base Facility and Revenue Processing Center, a 22-acre complex that maintains and houses a fleet of nearly 400 buses.

EMCOR also announced that its PACE Mechanical Services subsidiary has been awarded a design build contract for specialized work in Chrysler's new Axle Plant in Marysville, Mich.

In Seattle, Design Air will provide new radiant heating, lighting, and bus exhaust and HVAC systems for the Central Base Facility office and shop areas.

The company will also provide a new HVAC system and lighting package in the Revenue Processing Center and a gas-fired hot water boiler and chiller system; increase the building's natural gas pressure and install associated piping; seismically protect piping and equipment; and provide, modify, and repair electrical systems and roofing to accommodate all contract improvements. Because the entire facility will remain in operation throughout the construction period, Design Air also will provide the temporary power, heating, ventilation, materials, and equipment necessary to maintain operations at all times.

“This complex and sophisticated project is typical of the work that EMCOR is undertaking at key locations across the country as the need for transportation services and fail-safe infrastructure operations is integral to the growth and livelihood of the country's municipalities,” said Ron Hagen, president and CEO of Design Air.

“As such, it is imperative that we ensure the dependability and continuity of the technologically advanced, complex, integrated systems necessary to support transportation operations. Transportation is another market sector that EMCOR serves that significantly adds to the quality of life for all of us.”

In Marysville, Mich., PACE Mechanical will perform design build services for the HVAC, plumbing, and process work at the new facility, which is intended to provide advanced axle and drive train technology for Chrysler for years to come. The goal of this project is to attain LEED Certification, either Silver or Gold, and reduce water and overall plant energy consumption.

“The automotive industry is extremely competitive, and one of the keys to success in this industry is having the most efficient, high-tech facilities, enabling manufacturers to focus on doing what they do best — designing and building the world's leading automobiles,” said Kevin Cody, president of PACE Mechanical.

“The Detroit metropolitan area has long been an integral part of EMCOR's national footprint, as is demonstrated by this recent contract. PACE Mechanical looks forward to continuing to provide industry leading mechanical services and expertise to one of the country's most important businesses.”

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

This Month's Products

Products

THE ISOLAR DIFFERENTIAL TEMPERATURE CONTROLLER

is a compact, multi-functional controller for use in a wide array of applications. It features inputs for four sensors, and factory preset defaults able to control a standard solar water heating system...


THE KINETIC WATER RAM

clears clogged drains with green power. Just pump it up, insert it in the drain and snap the trigger...

A FULL LINE OF WATER-SAVING TOILETS

are available that allow the user to select either a 1.0 GPF flush for liquid waste, or a 1.6 GPF flush for solid waste...

THE DRYLOC PH AND ORP SENSORS

feature a foul-proof connector and robust body providing expanded chemical compatibility for use in a wide range of applications...

More Green Products

More Products

Website Directory Showcase

Contractor Opinion Poll

Industry Resources

  • Aug 2008 cover
  • July 2008 cover
  • June 2008 cover
  • May 2008 cover
  • April 2008 cover
  • March 2008 cover
  • Feb 2008 cover

Browse Back Issues