Eggrock to make new Marriott bathrooms


         Subscribe in NewsGator Online   Subscribe in Bloglines

Littleton, Mass. — Eggrock LLC, a manufacturer of pre-built bathrooms for the hotel construction industry, announced that it was awarded a contract for 118 pre-built bathrooms for a new Marriott SpringHill Suites in Romulus, Mich. The bathrooms were purchased by Group 10 Management of Livonia, Mich.

“Marriott's rebranding of their SpringHill Suites hotel is an important project which we are thrilled to be a part of,” said Jeff Barrett, president and CEO of Eggrock. “The new bathroom is a significant improvement in functionality, quality, and workmanship that will set a new standard for the market. Eggrock is excited to help Marriott ensure the quality of this new brand standard is met for new construction projects.”

“We selected Eggrock because they will allow us to build a higher quality hotel in less time than conventional construction,” said Kenny Koza, vice president of Group 10 Management. “Bathrooms are an important area for guest satisfaction yet the skilled trades required to build them are usually rushed at the end of the project. This results in poor workmanship and costly punch-lists that can be avoided by using bathrooms built ahead of time in a controlled factory and installed as a completed unit.”

Building each hotel bathroom at the construction site requires at least eight different specialty trades to complete, all within a confined space.

Eggrock builds bathrooms in a controlled manufacturing facility and delivering them to the construction site complete with finished floor and wall tiles, paint, wallpaper, fixtures, lighting, and electrical outlets all in place.

Want to use this article? Click here for options!
© 2010 Penton Media Inc.


Acceptable Use Policy
blog comments powered by Disqus

Best of 2009!


Here are Contractormag's top articles of 2009.
Click here to see if your favorites made the list!

Green Products

Phoenix Evolution Combined Hydronic Appliance

The Phoenix Evolution Combined Hydronic applicance melds hydronic space heating and domestic hot water in a single, 96% efficient package....

Baystone Faucet Collection

The Baystone Faucet Collection has a water flow of 1.5 GPM and is certified to meet the EPA's WaterSense criteria....

Condensing Tankless Water Heater

This condensing tankless water heater is able to deliver 8.0 GPM of heated water....

Neotherm Line of High-Efficiency Boilers

The Neotherm Line of High-Efficiency Boilers has been expanded with commercial and residential models, ranging from 80 MBH all the way to 850 MBH....

More Green Products

More Products

Website Directory Showcase

Social Media

Follow us on

Become a fan on

Opinion Poll

Industry Resources

Reader Comments

Powered by Disqus
  • August 2010 cover
  • July 2010 cover
  • June 2010 cover
  • May 2010 cover
  • April 2010 cover
  • March 2010 cover
  • February 2010 cover

Browse Back Issues